Work orders / WO-2026-01135
P2 WO-2026-01135
Corrective work order, Verified. At South Tacoma Way Plaza.
Response
- Priority
- P2, working-hours response (Mon–Fri 07:00–18:00 Pacific)
- Created
- Oct 27, 10:07 PDT
- Response due
- Oct 29, 12:07 PDT
- Planned
- Oct 27, 12:57 PDT
- On site
- Oct 27, 13:07 PDT
- Completed
- Oct 27, 16:13 PDT
- Verified
- Oct 27, 17:43 PDT
Who and where
- Site
- South Tacoma Way Plaza TW-TAC-011
- Technician
- Darnell Rhodes, Tacoma
- Contact
- +1-253-555-0316, darnell.rhodes@example.com
- High voltage cert
- Yes, valid until Oct 15, 2026
- Charge points
- TW-TAC011-CP1
Notes
GroundFailure on TW-TAC011-CP1. Ground fault detected during pre-charge; sessions abort before power flows.
Faults answered
| Fault | Severity | Age | Charge point | Raised | Origin | Work order |
|---|---|---|---|---|---|---|
| FLT-26-0932
GroundFailure, Closed |
High | 25 d 5 h | – | Oct 27, 09:26 PDT | ChargePoint | No work order |
| FLT-26-0933
InternalError, Closed |
Low | 25 d 5 h | – | Oct 27, 09:38 PDT | ChargePoint | No work order |
Service visits
Oct 27, 13:07 PDT to 16:13 PDT
Darnell Rhodes
- Findings
- Insulation resistance low on the output; the ground fault interrupter trips under load.
- Work done
- Replaced the ground fault interrupter module (RRE-GF-020); insulation test passed and three test sessions completed.
- Warranty claim
- VG-WC-26-0913
Parts fitted
| Part | Qty | Reason | From | Fitted |
|---|---|---|---|---|
| RRE-GF-020 Ground fault interrupter module | 1 | Repair | VanStock | Oct 27, 14:02 PDT |