Work orders / WO-2026-01120
P2 WO-2026-01120
Corrective work order, Verified. At Union Station Pacific Ave.
Response
- Priority
- P2, working-hours response (Mon–Fri 07:00–18:00 Pacific)
- Created
- Aug 19, 14:39 PDT
- Response due
- Aug 21, 16:38 PDT
- Planned
- Aug 20, 11:29 PDT
- On site
- Aug 20, 11:39 PDT
- Completed
- Aug 20, 14:36 PDT
- Verified
- Aug 20, 16:06 PDT
Who and where
- Site
- Union Station Pacific Ave TW-TAC-006
- Technician
- Megan O'Connell, Tacoma
- Contact
- +1-253-555-0305, megan.oconnell@example.com
- High voltage cert
- Yes, valid until Apr 12, 2027
- Charge points
- TW-TAC006-CP1
Notes
OverCurrentFailure on TW-TAC006-CP1. Output over-current trip at the start of a session.
Faults answered
| Fault | Severity | Age | Charge point | Raised | Origin | Work order |
|---|---|---|---|---|---|---|
| FLT-26-0917
OverCurrentFailure, Closed |
High | 94 d 1 h | – | Aug 19, 13:27 PDT | ChargePoint | No work order |
| FLT-26-0918
InternalError, Closed |
Low | 94 d 0 h | – | Aug 19, 13:39 PDT | ChargePoint | No work order |
Service visits
Aug 20, 11:39 PDT to 14:36 PDT
Megan O'Connell
- Findings
- One power stage draws unbalanced current and trips the protection.
- Work done
- Replaced the breaker 3-pole 125A (RRE-BR-300); load test passed at rated current.
- Warranty claim
- VG-WC-26-0910
Parts fitted
| Part | Qty | Reason | From | Fitted |
|---|---|---|---|---|
| RRE-BR-300 Breaker 3-pole 125A | 1 | Repair | VanStock | Aug 20, 12:34 PDT |