Work orders / WO-2026-01117
P2 WO-2026-01117
Corrective work order, Verified. At Aurora Travel Plaza.
Response
- Priority
- P2, working-hours response (Mon–Fri 07:00–18:00 Pacific)
- Created
- Aug 4, 10:11 PDT
- Response due
- Aug 6, 12:11 PDT
- Planned
- Aug 4, 16:01 PDT
- On site
- Aug 4, 16:11 PDT
- Completed
- Aug 4, 18:34 PDT
- Verified
- Aug 4, 20:04 PDT
Who and where
- Site
- Aurora Travel Plaza TW-SEA-017
- Technician
- Priya Raman, Seattle
- Contact
- +1-206-555-0247, priya.raman@example.com
- High voltage cert
- Yes, valid until Sep 30, 2026
- Charge points
- TW-SEA017-CP1
Notes
GroundFailure on TW-SEA017-CP1. Ground fault detected during pre-charge; sessions abort before power flows.
Faults answered
| Fault | Severity | Age | Charge point | Raised | Origin | Work order |
|---|---|---|---|---|---|---|
| FLT-26-0915
GroundFailure, Closed |
High | 109 d 5 h | – | Aug 4, 09:13 PDT | ChargePoint | No work order |
Service visits
Aug 4, 16:11 PDT to 18:34 PDT
Priya Raman
- Findings
- Insulation resistance low on the output; the ground fault interrupter trips under load.
- Work done
- Replaced the ground fault interrupter module (RRE-GF-020); insulation test passed and three test sessions completed.
- Warranty claim
- VG-WC-26-0908
Parts fitted
| Part | Qty | Reason | From | Fitted |
|---|---|---|---|---|
| RRE-GF-020 Ground fault interrupter module | 1 | Repair | VanStock | Aug 4, 17:06 PDT |