Work orders / WO-2026-01104
P3 WO-2026-01104
Corrective work order, Verified. At Lincoln Plaza Chargers.
Response
- Priority
- P3, working-hours response (Mon–Fri 07:00–18:00 Pacific)
- Created
- May 20, 10:49 PDT
- Response due
- May 27, 10:48 PDT
- Planned
- May 25, 10:38 PDT
- On site
- May 25, 10:48 PDT
- Completed
- May 25, 12:45 PDT
- Verified
- May 25, 14:15 PDT
Who and where
- Site
- Lincoln Plaza Chargers TW-BEL-002
- Technician
- Hannah Lindqvist, Bellevue
- Contact
- +1-425-555-0262, hannah.lindqvist@example.com
- High voltage cert
- Yes, valid until May 20, 2027
- Charge points
- TW-BEL002-CP1
Notes
HighTemperature on TW-BEL002-CP1. Cabinet temperature above the limit; output power derated.
Faults answered
| Fault | Severity | Age | Charge point | Raised | Origin | Work order |
|---|---|---|---|---|---|---|
| FLT-26-0902
HighTemperature, Closed |
Medium | 185 d 4 h | – | May 20, 10:07 PDT | ChargePoint | No work order |
Service visits
May 25, 10:48 PDT to 12:45 PDT
Hannah Lindqvist
- Findings
- Cooling fan not spinning and the intake filter clogged with dust.
- Work done
- Replaced the 24V control relay (OLY-RLY-24); cabinet temperature normal after thirty minutes at full load.
- Warranty claim
- VG-WC-26-0901
Parts fitted
| Part | Qty | Reason | From | Fitted |
|---|---|---|---|---|
| OLY-RLY-24 24V control relay | 1 | Repair | VanStock | May 25, 11:43 PDT |