Demo data. These are example records in the Tidewire model, not live data from the charging backend.
Live updates on Data as of 13:38:41 PST

Work orders / WO-2026-01136

P3 WO-2026-01136

Corrective work order, Verified. At Rainier Valley Commerce Lot.

Response

Priority
P3, working-hours response (Mon–Fri 07:00–18:00 Pacific)
Created
Oct 27, 11:15 PDT
Response due
Nov 3, 11:15 PST
Planned
Oct 29, 09:20 PDT
On site
Oct 29, 09:30 PDT
Completed
Oct 29, 11:00 PDT
Verified
Oct 29, 12:40 PDT

Who and where

Site
Rainier Valley Commerce Lot TW-SEA-014
Technician
Marcus Bennett, Seattle
Contact
+1-206-555-0201, marcus.bennett@example.com
High voltage cert
Yes, valid until Mar 31, 2027
Charge points
TW-SEA014-CP1

Notes

ConnectorLockFailure on TW-SEA014-CP1. Connector latch will not lock; the plug cannot be secured.

Faults answered

FaultSeverityAgeCharge pointRaisedOriginWork order
FLT-26-0934
ConnectorLockFailure, Closed
High 25 d 4 h–
Oct 27, 10:30 PDT ChargePoint No work order

Service visits

Oct 29, 09:30 PDT to 11:00 PDT Marcus Bennett
Findings
Latch lock actuator seized; the pin does not travel.
Work done
Replaced the connector latch lock actuator (CEV-LCK-01); locking tested with ten plug-in cycles.

Parts fitted

PartQtyReasonFromFitted
CEV-LCK-01
Connector latch lock actuator
1RepairVanStockOct 29, 10:25 PDT
The connection to the dashboard was interrupted. Reload